Why treat the soil instead of the damaged wood?
Because the colony is not in the wood, it is in the ground, and the wood is where it feeds. Treating a damaged board kills what is in the board and leaves the thing that sent it. The soil band addresses the route every forager has to use.
This is also why the continuity of the band matters more than the strength of anything applied. Foragers search; a gap in a band is found eventually, and a treatment with a gap buys time rather than control. That is the reason a trench is opened rather than a surface poured, the reason the label specifies a volume per linear foot, and the reason concrete gets drilled instead of worked around.
It is also why the physical corrections are not optional extras. A deck post set into the soil, mulch heaped over a brick ledge, or siding that reaches the ground are all bridges over the band, and leaving one in place after a treatment undoes part of what was paid for. A technician who skips that conversation has not finished the job.
Does the drainage of the lot change how this is done?
It changes what the soil does with what goes into it, and what the band is up against afterward. Barnesville sits on the Eastern Continental Divide, and a lot's fall here cannot be assumed from the neighborhood.
The Georgia Environmental Protection Division's hydrogeology of Lamar County records the south end of the city draining by Tobler Creek to the Flint River and the north side draining by Big Towaliga Creek to the Little Towaliga, the Towaliga and eventually the Ocmulgee, with the county's western third in the Upper Flint River sub-basin. Two houses a few streets apart can shed in opposite directions, so the grade gets read at the wall rather than inferred.
The practical consequences are ordinary. A downspout emptying beside a freshly trenched wall moves soil and water through the band. A grade that falls toward the foundation keeps the ground wet between rains, which is the condition that made the structure attractive in the first place. University of Georgia's fire ant guidance makes the related point about outdoor applications and waterways, and the same caution applies to anything applied in soil near a creek or a drainage swale.
What does Georgia require to be in the contract?
The Georgia Department of Agriculture requires a written contract for structural pest control services including termite work, with specific rules for wood-destroying-organism contracts. The contract must carry an insurance statement and must say whether the licensee holds a bond for the job, and records are kept for two years after the contract ends.
Those are the requirements that can be stated plainly, and a homeowner should check for them before signing: an insurance statement on the document, and a clear statement about bond coverage for this job. The full set of required contents is not something to take from a web page, including this one, and anyone who wants the complete rule should ask the Department of Agriculture's Structural Pest Control Commission, which is the body that administers it.
What else goes on the paper is a matter for negotiation and for reading carefully. Ask what is covered, which structures on the property are included, what a renewal does and does not continue, and what happens if activity is found later. Keep your copy, and keep the drawing with it. Termite contract and renewal covers that document in more detail.
Is the building finished with termites after a treatment?
No, and nobody honest will say otherwise. The treatment addresses the colony's route into this building. It does not change the fact that the surrounding soil holds termites, and it does not protect a route that is created later.
What creates a new route is usually human: a patio poured against the wall, a yard regraded, a flower bed built up over the ledge, a deck added with posts in the ground, a trench dug for a utility line through treated soil. Any of those can interrupt a band. So can time, since nothing applied to soil stays at its original concentration indefinitely.
That is the argument for an inspection schedule rather than a one-time purchase, and for keeping the record where it can be found. Where a property is being watched over years, a station arrangement is often added, because stations produce a reading at every visit rather than only a conclusion. No arrival time is promised for any visit, and the schedule for a follow-up is agreed with the company.