Why are two termite contracts on the same street priced differently?
Because the contract follows the work, and the work follows the building. Perimeter length, foundation type, how much concrete abuts the structure, the number of covered structures, what was found, and whether the agreement includes a station schedule all move it.
The scope item people underestimate is the number of structures. A contract covering a house is a different document and a different commitment from one covering a house, a detached garage and a barn, and each additional building brings its own perimeter and its own inspection time. So does an addition on its own foundation, which adds a junction in the middle of the footprint rather than at its edge.
The other variable is the service, not the installation: how often anybody comes out, and what the agreement commits them to doing when they do. No figure for any of this is published here. The company explains what the arrangement covers, and the figure is agreed and approved before anything starts, which is the same point at which the scope should be nailed down.
What does Georgia actually require this document to carry?
The Department of Agriculture says contracts are required for structural pest control services including termite work, with specific rules for wood-destroying-organism contracts. Two requirements are plain: an insurance statement on the contract, and a statement of whether the licensee holds a bond for the job.
Those are the ones to check on the page in front of you, and they are easy to check. A homeowner looking at an agreement that has neither has a reasonable question to put to the company before signing. Anything beyond those two should not be taken from a web page, this one included, because the full set of required contents is a matter for the rule itself.
The body to ask is the Georgia Department of Agriculture's Structural Pest Control Commission, which administers licensing, operator credentials, contracts and complaints about licensed companies. That is also where a complaint goes if an agreement is not being honored. Do not take a company's description of what a contract must contain as the rule; ask the regulator.
How long will anyone still have the records?
The Department requires records to be kept for two years after a contract ends. A house lasts a great deal longer than that, which is why the homeowner's own file is the one that matters over the life of a building.
This is the quiet problem behind a lot of termite questions in older towns. A building treated decades ago may have had excellent work done on it, documented carefully, with nothing now retrievable from anyone. Barnesville has been the Lamar County seat since the county was formed in 1920 and its older streets carry houses that long predate any current arrangement, so an inspector arriving at one of them is frequently working without a history.
The fix is unglamorous and entirely within a homeowner's control. Keep the contract, the drawing, every service record, and a note of who did the work, in one place, digitally as well as on paper. If the house is sold, hand the file over. A future inspection that can be compared with a documented past is worth more than any assurance about what was done.
What should be settled before a renewal is paid?
Three things: what inspection actually happened during the term that is ending, what it found, and what the next term commits the company to. A renewal paid without those answers continues a document rather than a service.
Ask for the record of the last inspection in writing, and read where on the structure the inspector went and what could not be reached. If the answer is that nobody has been under the house in three years, that is the conversation to have before money changes hands. A renewal is the one moment in the year when both parties are focused on the agreement.
Then look at the property rather than the paper. An addition built since the contract was signed, a patio poured against the wall, a regraded yard or a new deck with posts in soil each change what is being protected, and may sit outside the scope that was agreed. Say so at renewal and get the change written in rather than assumed.
Does the contract follow the house when it is sold?
That depends on what the document says, and it is worth knowing before a sale rather than during one. Some arrangements transfer, some end, and some can be transferred only with the company's agreement and on terms that differ from the original.
For a seller, the practical step is to find the contract, the drawing and the service records early and ask the company in writing what transfers. For a buyer, the step is to ask for those documents and read them, including what the previous term covered and what was found. A building with a documented treatment history and a current arrangement is a better-understood building than one with neither.
Keep this question separate from the inspection document used at a transfer. Georgia's form for reporting wood-destroying organisms in a real property transfer is the Official Georgia Wood Infestation Inspection Report, which is covered on the report page. A service contract and that report are different instruments doing different jobs.